DE | EN
Tel: +43 1 865 76 00 office@eberail.at DE | EN
DE | EN
Our Solutions · Electronic Interlocking System

diaLOC

Flexible, modular system for every type of requirement.
Digital Interlocking

The innovative interlocking system.

diaLOC is built from proven and reliable components from industrial and railway technology, with a focus on customised products for special applications. The areas of application are wide-ranging – from individual point control and route control to interlocking systems for regional railways or shunting areas.

diaLOC is based on an industrial safety control system already familiar from the iSiS-LC modular system for level crossings. While diaLOC currently speaks many ‘languages’ (interfaces) to communicate with peripheral systems, the system is being prepared for the future use of EULYNX.

Waldviertelbahn railcar in service

From individual points to full shunting areas –
one system for every requirement.

Core Elements

Element controller and route computers as the heart of the system.

The element controller and route computers form the heart of the diaLOC system. The entire control and functionality is implemented by these safety computers – in SIL4 or SIL2, depending on the architecture selected. All field elements report the current status to the element controller, including the signals, the highly reliable track vacancy detection based on wheel sensors with state-of-the-art algorithms, and the point machines.

The route computer receives all the information it needs from the element controllers to set the routes selected by the control centre or the operating computer. The element controllers can be expanded at any time – additional safety elements such as track gates or key locks can be integrated as required by the customer.

Control cabinet with element controller and route computers
diaLOC Operation and Control Software – track diagram diaLOC train control sheet – time-distance diagram diaLOC in practical use – operation across multiple monitors
Operation and Visualisation

The graphical user interface.

Depending on the area of application, simple pushbuttons and route control panels or graphical user interfaces and remote control systems are used for operation. The graphical user interface is customised to the requirements of the railway company and, if required, supplemented with functionalities for dispatching and administrative tasks.

Technical Data

The key facts at a glance.

Centralised or decentralised architecture
Highly reliable track clearance
Developed to CENELEC EN 50126, EN 50128, EN 50129
Adaptable safety architecture (SIL4 or SIL2)
Extended temperature range, suitable for outdoor cabinets
EULYNX-ready, IP-based network components
Examples of Application Areas

A wide range of applications.

Industrial railways and trams

diaLOC can control single points or act as a full interlocking system for shunting.

Regional railways

diaLOC as a simplified electronic interlocking system with digital interfaces to the external systems.

Level crossing monitoring

diaLOC for safe remote monitoring of level crossing safety systems via mobile communications.

Interested in diaLOC for your interlocking project? Enquire Now

The Advantages at a Glance

Why diaLOC?

Flexible and modular system with digital interfaces
Ideal for customised modifications and individual solutions
Wireless communication between system components
Comprehensive diagnostics by the railway company and the EBE service centre using remote diagnostics
Low maintenance requirements, standardised components for all EBE safety systems
Frequently Asked Questions

Questions and answers about diaLOC.

diaLOC – digital Interlocking – is an electronic interlocking system made up of proven and reliable components from industrial and railway technology, with a focus on customised products for special applications.

Yes. While diaLOC currently supports many interfaces to communicate with peripheral systems, the system is additionally being prepared for the future use of EULYNX.

diaLOC covers a wide range of applications: as individual point control or a full interlocking system for shunting on industrial railways and trams, as a simplified electronic interlocking system for regional railways, and for the safe remote monitoring of level crossing safety systems via mobile communications.

Depending on the area of application, simple pushbuttons and route control panels or graphical user interfaces and remote control systems are used. The user interface is customised to the requirements of the railway company.

Other Solutions

A good match for diaLOC.

iSiS-LC

SIL4-certified level crossing system for main lines, regional, industrial and heritage railways.

Learn more

STRAIL

Level crossing systems made of solid rubber – exclusive Austrian partner of KRAIBURG STRAIL.

Learn more
Scroll